What is backlog in construction?

Also called: Signed backlog

The short answer

Revenue under contract that has not yet been earned: the remaining value of signed contracts. Contractors often express it in months of revenue, as a measure of how far ahead the work is secured.

An example

A contractor with $120M of signed contracts that has earned $45M on them so far has $75M of backlog. At $10M of revenue a month, that is about 7.5 months of work secured.

Why it matters to a general contractor

Backlog is the first number a surety, lender or buyer asks about, because it shows how much future revenue is already won. Its quality matters as much as its size: backlog bid at thin or fading margins can look healthy and still lose money.

Walkthrough

See dideh run a modeled contractor.

We’ll walk you through a fully modeled general contractor, with WIP, pay-when-paid cash, governed questions and the specialist team in simulation. Then we’ll talk through your systems and what a first phase would cover.

Prefer email? Write to hello@dideh.ai.

We use these details only to arrange the walkthrough.