Free template
WIP schedule template for general contractors.
A free work-in-progress schedule in Excel: contract, estimated cost, percent complete, earned revenue, over and under billing, and projected margin against bid for every open job, with the month’s fade flagged.
Download the template
An Excel workbook with sample figures, live formulas and a dashboard of charts. It opens in Excel, Google Sheets and Numbers. Free to use and adapt, with no sign-up needed.
WIP schedule (.xlsx) · 75 KBWhat’s inside
Every column, explained.
- Contract
- Original contract plus approved change orders gives the revised contract, the revenue the job should earn.
- Cost
- Estimated total cost (EAC) and cost to date give cost to complete, and percent complete on the cost-to-cost method.
- Revenue
- Earned revenue is the revised contract times percent complete.
- Billing
- Billed to date less earned revenue is over or under billing: positive means billings run ahead of the work, negative means work you have done but not billed. See over and under billing, explained.
- Margin
- Projected gross profit and margin at completion, the bid margin, the fade since bid and the change since last month. Fade beyond half a point shows in red.
- Totals
- A totals row for the whole backlog, and room to add jobs.
- Dashboard
- Headline figures (contract value, margin, fade, net billing position) and charts of margin against bid, fade by job, and over and under billing by job.
- Start here
- A cover sheet on what the schedule is, how to fill it in, and where to read more.
How to use it
From your ledger to a monthly review.
- 01
Set the month-end date, then replace the five sample jobs with your open jobs. Blue cells are inputs; everything else calculates.
- 02
Take contract, change orders, cost to date and billed to date from your accounting system, as of month end.
- 03
Get an updated estimated total cost from each project manager. The schedule is only as good as this number.
- 04
Enter last month’s projected margin for each job, so the schedule shows what moved this month.
- 05
Review it with operations: start with the biggest fade, then the largest under billing, then any job whose margin moved by more than half a point.
For a full walk-through of every column and a worked example, read WIP schedule: how general contractors build and read one. To see why the margin column matters most, read profit fade, or try the profit fade calculator. To check one job’s billing position, use the over/under billing calculator.
FAQ
About the template
If yours isn’t here, bring it to the walkthrough.
What is a WIP schedule?
A work-in-progress schedule lists every open job with its contract, estimated cost, percent complete, earned revenue, billings and projected margin. It is how a general contractor recognizes revenue on the percentage-of-completion method and how sureties and lenders judge the health of the backlog.
Which percent-complete method does the template use?
Cost to cost: cost to date divided by estimated total cost. It is the most common method for general contractors. If you use another, replace the percent-complete column and the rest calculates from it.
Are the sample jobs real?
No. They are illustrations so the formulas show something on first open. Replace them with your own jobs.
How does dideh handle WIP?
dideh builds WIP from your systems of record, forecasts each job’s margin at completion from its schedule, cost to complete and the history of similar jobs, and flags fade while there is time to act.